Urethane Cement Flooring in Kokomo IN - a floor built for washdowns and heat
Epoxy lifting in a room you wash down, heat or splash with chemicals? We lay a thick urethane cement floor made for that work.
- Moisture checked first We check the slab's moisture before any material gets mixed.
- Down to clean concrete We take the slab down to clean, dry concrete first.
- Right floor for the room We steer wet, hot or harsh rooms to urethane over epoxy.
- Closure planned around cure We schedule your shutdown around the product's own cure time.

- Licensed and fully insured.
- Free in-person estimates.
- Replies within 1 business day.
How do you know your floor needs urethane cement?
A coating that's failing in a wet, hot or harsh room usually gets worse with every washdown, so it pays to catch these signs before the slab underneath takes damage.
Epoxy peeling after washdowns
You see coating lifting in sheets where water sits or gets sprayed. Usually the floor wasn't built for wet work, and each washdown loosens more of it.
Cracks near ovens and coolers
Cracks show up near fryers, ovens, coolers or hot-water washdowns. Repeated heating and cooling works a thin coating loose, and the cracks spread until the slab is bare.
Dull, eaten spots from spills
Cleaners, acids, oils or sugars leave dull, soft or eaten-away patches in the finish. The coating isn't standing up to what gets spilled, and the concrete under it is next.
Gouges from carts and pallets
Heavy carts, dropped tools or pallet jacks chip and gouge the floor along the paths they travel. Each chip lets water and grime in, so the damage widens with use.
Rough, pitted bare concrete
Bare concrete in a working room turns rough, dusty or pitted and soaks up whatever hits it. It gets harder to keep clean every month it stays uncoated.
Hairline cracks and old patches
Fine cracks, old patches and small chips break up the floor and catch dirt. Left alone they let liquid under the coating, and repairs get bigger the longer they wait.
How we lay urethane cement flooring
Urethane cement flooring in Kokomo is what I recommend for rooms that get washed down, heated, splashed with harsh chemicals or run over by heavy carts, because those are the rooms where a thinner epoxy coating usually gives out first. Before anything goes down, I check the slab's moisture, and our crew takes the slab down to clean, dry concrete so the new floor bonds to the concrete itself and not to old coating or grease. Then we lay the urethane cement and plan your closure around that product's own cure. The price moves with the size of the floor, the condition of the slab and how heavy a floor the room needs, and the schedule turns on the moisture check and the product's cure, so the visit to your property is where you get your own figure.
Not every room in a building needs urethane cement, and I'd rather tell you that than sell you more floor than the room calls for. A dry showroom, office or front counter often does well with polished concrete flooring, and where you want color on the slab you already have, stained concrete flooring can carry the look through the dry rooms while the kitchen or wash bay gets urethane cement.
What happens after you call about a urethane cement floor in Kokomo?
The job runs in four steps, and the slab gets looked at and tested before we settle on a floor or a date.
Call and set a visit
Call or use the form and we'll set a time to see your floor. The visit checks the slab for moisture, old coatings and cracks.
Go over your estimate
Your estimate explains the prep as well as the finish. If the slab isn't ready for a floor, I'll tell you so plainly.
Prep and lay the floor
We pick a date around your schedule and the product's weather needs, then do the prep and lay the urethane cement.
Walk the finished floor
We clean up and walk the finished floor with you, and go over the regular cleaning that keeps it looking its best.
Why Kokomo business owners call Kokomo Anchor Epoxy Flooring

The owner tests your slab
I come out myself to test the slab, so your recommendation comes from the person who answers for the work.

Working from Kokomo since 2017
I started this business here in 2017 after learning the trade on a flooring crew, sweeping grinder dust before running the machines.

Licensed, fully insured crew
We're licensed and fully insured, so you're not carrying the risk of a crew running grinders in your building.

On site through the coating
I'm on the job with our crew through the prep and coating, so the person who tested your slab is there.
Get an estimate for your urethane cement floor
Tell us the floor's size, how the room is used and whether it serves food. We reply within one business day to set a time for me to come out for a free on-site estimate, with no obligation.
Examples of hard-working concrete floors
Look through these examples of urethane cement and other concrete floors to get a feel for the finishes and textures this kind of work can give.
Urethane cement questions we hear
These are the questions business owners ask before a urethane cement floor goes in. If your room has something unusual about it, call and ask about your own floor.
Is urethane cement or epoxy better for my floor in Kokomo?
Urethane cement is usually the better choice for rooms that get washed down, heated and cooled, splashed with aggressive chemicals or knocked around by heavy equipment, which is where one flooring maker recommends it. It's a urethane binder mixed with Portland cement and graded aggregate, laid as a thick layer that takes impacts and can bridge minor flaws in the slab. The same maker says epoxy serves dry rooms with steady temperatures and moderate traffic at a lower cost, so I match the floor to how your room actually works.
How much does urethane cement flooring cost in Kokomo?
I can't give you a fair number until I've seen the slab, because the prep is usually the biggest unknown on a urethane cement job. A floor with old coatings to remove, cracks to repair or moisture to wait out costs more than a clean, sound slab, and a heavier build for carts and heat costs more than a lighter one. Using epoxy or polished concrete in the dry rooms of the same building can bring the total down, and I'll point out where that makes sense when I see the space.
How long does a urethane cement floor take to cure before we can reopen?
One maker's guide says a new urethane cement floor cures undisturbed for 12 to 24 hours and reaches its full chemical and mechanical properties within 7 days. Those are that maker's numbers, and the product chosen for your room sets its own times, so I plan the closure around its cure along with the prep and any slab testing ahead of it. In practice, that means planning around the first cure and expecting full performance once the first week has passed.
Why do you test the concrete slab before laying urethane cement?
Moisture in the concrete has to be assessed before any urethane cement goes down, and testing is the only way to know what your slab is holding. One maker describes urethane cement as highly tolerant of moisture underneath it, but I still check, since that general tolerance doesn't tell me about your particular slab. When in-slab humidity sensors are used, each one settles for 24 hours before its reading counts, so leave that day in your schedule.
How do I prepare a concrete floor for urethane cement?
You clear the room, and our crew handles the rest of the prep. One maker's application guide calls for removing oil, grease, dirt and old coatings, roughening the concrete with a diamond grinder or shot blaster and leaving it completely dry. The same guide calls for proper ventilation and respiratory protection during installation, so it's fair to ask any contractor, us included, how they'll ventilate your room.
Who handles permits for urethane cement flooring in Kokomo?
Kokomo's Permits Department handles commercial improvements, so that's where the question of a permit for your floor gets settled, and we check with the city before we start and handle the paperwork when one is needed. If you run a food business, the Howard County Health Department requires a plan review to remodel a retail food establishment, and it goes in with the food permit application and fees. For new construction, that review is filed at least 30 days before construction or opening, so build it into your timeline.
Where we lay urethane cement floors
We're based in Kokomo and work across the cities around it, where business owners call us about shop, plant and store floors. Pick your city below or call us.
Find out if your slab is ready for urethane cement
Our work is backed by our satisfaction guarantee, and knowing your slab's condition early lets you plan the closure around your own calendar.
